The Strategic Plan of St. Paul's Church 1999-2005 calls for a complete Master Plan study and Capital Improvement Campaign to culminate in 2006 with the 150th anniversary celebration of St. Paul's.
Master Plan committee
Jeffrey Hayes, chairperson
Richard Alexander
Steve Bolinger
Robert Busser
Ralph Doty
John Francis
Ken Garner
Steve Pearson
Anita Schell-Lambert
Louise Thompson
Jane Zakrewski
Architectural Firm
Atkins
Olshin
Lawson-Bell
A R C H I T E C T S
You will find here a first reporting of some of the findings of the building consultants along with ideas and concepts for improvements and upgrade to the facilities. In these concepts, you will find that particular attention is given to making the multi-level campus accessible to ALL.
At this stage we invite comments from all parishioners as we discern our course together for this most amazing project and to provide a viable St. Paul's for generations to come.
Click on the blue links below to view the following:
Architect and
Consultant Conditions
Assessment Report and Preliminary
Recommendations
|
Lower Level Plans
includes Parish House Basement
These plans include the elevator traveling to the parish house basement, reconfigurement of storage and space available for housing and upgraded bathroom and shower facilities. |
 |
 |
 |
Click on this image
for existing plan. |
|
Click on this image
for concepts. |
|
|
|
|
Ground Level Plans
includes current parish hall, Parish House, crypt, Dixon House basement
These plans include the elevator traveling to the Parish Hall level, relocation of the parish offices to this level of the Parish House, a new choir/music suite in the current crypt area, improved bathroom facilities and lowering the level of the stage and providing for storage. |
 |
|
 |
Click on this image
for existing plan.
|
|
Click on this image
for concepts. |
|
|
|
|
First Level Plans
includes church school classrooms and first floor of Dixon House
These plans include the elevator traveling from the church floor level up to choir area or down to parish hall and basement. Relocation of the chapel to the fly-space area above the current stage. Handicapped ramp from elevator lobby to classrooms. Reconfiguration of the classrooms to three large dividable rooms with bathrooms and the addition of bathrooms and new kitchen to Dixon House. |
 |
|
 |
Click on this image
for existing plan. |
|
Click on this image
for concepts. |
|
|
|
|
Second Level Plans
includes second floor of Dixon House and apartment
These plans call for the relocation of the Samaritan Counseling Center to the second floor of Dixon House. The space currently occupied by the parish offices. |
 |
|
 |
Click on this image
for existing plan. |
|
Click on this image
for concepts. |
|
|
|
|
Outdoor Plans
REVISED JULY 10, 2003
These plans call for the elimination of the driveway through the campus and include the addition of some parking behind the rectory. The current Bethlehem Pike entrance would be turned into a two-way driveway with a circular drop-off/turn-around area near the church. Dixon House would have a covered roof added around the side to provide shelter from inclement weather and the portcochere would also be enclosed with glass walls.They also propose a terrace along the side of the church which will have a labyrinth built into the floor and the terrace would be large enough for a party tent. The lower Chestnut Hill drive would be turned into a semi-circular "drop-off" area. All of these areas would be accessible to the Parish House without steps and then accessible to the elevator which transports to other levels. This plan is still very much fluid in our attempts to satisfy safety with traffic flow to and from the campus. |
  |
| Click on this image for concepts. |
The Master Plan Committee and vestry welcome your comments to these concepts. You can leave your comments on post-it note by the display in the Parish Hall or you can email your comments to